Hanging locker with only one coat of paint |
Today I spent an hour or so fiberglassing the head locker face and the settee tops/backs - oh, and the second shelf that I ended up adding to the lower part of the hanging locker. The tabbing ties the structures together, strengthening and securing them.
In the areas of the settees, I added a top layer of cloth to provide a smoother finish than the biaxial under it and to protect the cushions from snags and scratches.
No comments:
Post a Comment